From time to time, IMCO General Construction, will need to perform specific work after normal working hours as required by tidal conditions. This will only be in the case where a portion of the overall work must be performed safely at or near low tide for visibility purposes and/or for enhanced protection of the environment.
IMCO has received permission for their carpenters to construct formwork and install rebar for the new bulkhead’s concrete pile cap from 11:00 a.m. to 11:00 p.m. next Monday, March 8, through Friday, March 12. The following conditions were stipulated in the approval for the modification to Des Moines Municipal Code 14.04.170 Hours of Construction:
1. Construction lighting shall be directed away from the residential areas and limited to lighting required to safely illuminate the work zone as established by industry standards;
2. When work will occur after 7 p.m., all efforts will be made to stage materials near the work zone prior to 7 p.m. in order to reduce the use of construction equipment required to utilize back-up alarms;
3. Compliance with State of Washington noise ordinances (WAC 173-60-40/WAC 173-60-50); and
4. When work occurs after 10:00 p.m., the Contractor shall take periodic noise readings to ensure compliance with the requirements of WAC 173-60-040.
If you have any questions about this work, please don’t hesitate to contact me or Harbormaster/Project Manager Joe Dusenbury.
Thank you for your continued patience and cooperation during construction.